SC_Core Error [8]
Array to string conversion
Line 47 in /volume1/web/_rra/_core/RRA_Station.php
Backtrace
#0 SpoiltCat\Error_Handler() called at [/volume1/web/_rra/_core/RRA_Station.php:47] #1 rra\Station_Info->__construct() called at [/volume1/web/r__/APIs/240701/R__.php:415] #2 Spoilt\Spoilt_Core->fetchObject() called at [/volume1/web/_rra/pages/_station.php:16] #3 include_once(/volume1/web/_rra/pages/_station.php) called at [/volume1/web/r__/index.php:41] #4 require_once(/volume1/web/r__/index.php) called at [/volume1/web/_rra/index.php:6]
SC_Core Error [8]
Array to string conversion
Line 48 in /volume1/web/_rra/_core/RRA_Station.php
Backtrace
#0 SpoiltCat\Error_Handler() called at [/volume1/web/_rra/_core/RRA_Station.php:48] #1 rra\Station_Info->__construct() called at [/volume1/web/r__/APIs/240701/R__.php:415] #2 Spoilt\Spoilt_Core->fetchObject() called at [/volume1/web/_rra/pages/_station.php:16] #3 include_once(/volume1/web/_rra/pages/_station.php) called at [/volume1/web/r__/index.php:41] #4 require_once(/volume1/web/r__/index.php) called at [/volume1/web/_rra/index.php:6]

City Thameslink Railway Station

City Thameslink station is in the London region of England. Rudy is focussing on mostly Scottish Stations to visit but if we ever run out of those then who knows where we'll end up going!

City Thameslink is a central London railway station within the City of London, with entrances on Ludgate Hill and Holborn Viaduct. The station is on the Thameslink route between Blackfriars to the south and Farringdon to the north.

The station opened in 1990 to replace Holborn Viaduct railway station. It was part of the Thameslink project that re-opened the Snow Hill Tunnel to provide a continuous north–south route across London. Originally named St. Paul's Thameslink, it was renamed City Thameslink the following year to avoid confusion with the nearby St Paul's tube station on the Central line (note that out-of-station interchange discount does not apply for changing between these two stations). The station was refurbished in 2010–11 to increase capacity, and the timetable was revised in 2018 with the introduction of automatic signalling.

Wikipedia