SC_Core Error [8] Array to string conversion Line 47 in /volume1/web/_rra/_core/RRA_Station.phpBacktrace
#0 SpoiltCat\Error_Handler() called at [/volume1/web/_rra/_core/RRA_Station.php:47] #1 rra\Station_Info->__construct() called at [/volume1/web/r__/APIs/240701/R__.php:415] #2 Spoilt\Spoilt_Core->fetchObject() called at [/volume1/web/_rra/pages/_station.php:16] #3 include_once(/volume1/web/_rra/pages/_station.php) called at [/volume1/web/r__/index.php:41] #4 require_once(/volume1/web/r__/index.php) called at [/volume1/web/_rra/index.php:6]
SC_Core Error [8] Array to string conversion Line 48 in /volume1/web/_rra/_core/RRA_Station.phpBacktrace
#0 SpoiltCat\Error_Handler() called at [/volume1/web/_rra/_core/RRA_Station.php:48] #1 rra\Station_Info->__construct() called at [/volume1/web/r__/APIs/240701/R__.php:415] #2 Spoilt\Spoilt_Core->fetchObject() called at [/volume1/web/_rra/pages/_station.php:16] #3 include_once(/volume1/web/_rra/pages/_station.php) called at [/volume1/web/r__/index.php:41] #4 require_once(/volume1/web/r__/index.php) called at [/volume1/web/_rra/index.php:6]
Corby Railway Station
Corby railway station, owned by Network Rail and managed by East Midlands Railway, is in Corby, Northamptonshire, England. The current station, opened on 23 February 2009, replaces an earlier one dating from 1879, first closed on 18 April 1966 but reopened between 1987 and 1990.
Plans for the current station, opposite the original, were approved in late 2007. It opened with just one daily train each way on Mondays to Fridays. The full current service of hourly trains to and from London began on 27 April 2009, after East Midlands Trains had taken delivery of the additional trains needed for its implementation.
Wikipedia